RFPs/ITB 2025-26 School Year
- RFP ESE 2025-1.pdf (1.5 MBs)
- 2025 Food Service Equipment Bid.pdf (926.6 KBs)
- Food Service Equipment Locations.pdf (79.2 KBs)
- RFP--DESIGN-BUILD SERVICES REPLACEMENT GENERATOR FOR HDSB & BONIFAY K-8.pdf (8.3 MBs)
- Milk ITB August 2025.pdf (1.9 MBs)
E-Rate Requests for Proposals 2026
- RFP E Rate Category 2 Switches.pdf (680.9 KBs)
E-Rate Questions & Answers
Question:
Called out - ICX8200-48ZP2
There are 2 versions of this. One P/S and Fan or the E2, which is dual P/S and Fan
ICX8200-48ZP2-E - ICX 8200 Switch, 32×10/100/1000 Mbps PoE+ ports, 16×100/1000/2500 Mbps RJ-45 PoE++ ports, 4×25 GbE SFP28 stacking/uplink-ports, 800 W PoE budget (with one PSU), hot swap power supplies and fans, one power supply and one fan included, three-year remote TAC support. Power cord not included. TAA
ICX8200-48ZP2-E2 - ICX 8200 Switch, 32×10/100/1000 Mbps PoE+ ports, 16×100/1000/2500 Mbps RJ-45 PoE++ ports, 4×25 GbE SFP28 stacking/uplink-ports, 1480 W PoE budget, hot swap power supplies and fans, two power supplies and two fans included, three-year remote TAC support. Power cords not included. TAA
Which do you want?
2nd – These do not include power cords, Do you need power cords? Typically those are just reused, but I want you to specify.
3rd – These stack with 25Gig SFP28 cables, Do you need any stacking cables? If so how many?
(Note: these can stack with 10Gig twinax cables)
Answer:
- Thanks for letting me know. We would want the -E2.
- We have plenty of power cords, so we shouldn't need any.
- We have the 10Gig twinax cables, so we should be good there.